Due to the current nationwide lockdown work to re-wheel the locomotive has been delayed. As well as paid engineering work, there is still some voluntary work required to paint the wheel sets and parts of the loco’s frames before we are in a position to fit the driving wheels. I am hoping that the frames […]
